MAINTENANCE-TRANSPORTING
PUSHING MACHINE
The machine may be pushed for short distances at
speeds not to exceed 5 mph. Be careful to avoid
damaging machine. The machine may be pushed by
hand from the rear.
NOTE: To avoid damage caused by regenerative
voltage, disconnect traction motor before towing or
pushing machine.
MACHINE TIE-DOWNS
There are two tie points located at front and each side
of foot box frame and two at the front side of frame.
Tie-down devices must be of the proper type and
strength. The combined strength of all tie-downs must
be strong enough to lift two times the weight of the
machine. Tie-downs must be positioned to prevent
the machine from moving forward, backward, or either
side to side. Use all four corners of the machine with
the tie-downs running out opposite directions. Tie-
downs must be attached to the transporting vehicle
securely.
PREPARATION FOR LOADING /UNLOADING
TRAILER
Before loading or unloading machine from trailer,
remove squeegee, scrub deck, side skirts or side
squeegees, Aqua-Mizers and scrub brushes
(pads) to eliminate interference with tie-downs.
Scrub head must be in the up position before
loading.
NOTE: When transporting the machine on a trailer
or in a truck, in addition to using tie-downs, be
sure to set the parking brake, and block the tires to
prevent the machine from rolling.
TIE DOWN POINTS
4-28